Before I tell you what The Boss and I got up in our week of work let me show you the beautiful view from our bedroom window. I took this photo sitting up in bed, after I had flung the shutters and window open.
The same morning from the front garden.
The electrician had been and look! strange glowing things in the kitchen ceiling. The holes that we made were in the wrong place, so he had drilled new ones.
And that's not all, there are also lights in the new bathroom ceiling, albeit with a temporary light bulb.
In fact we've now got power sockets and lights in every room and a front and back outside light. When the outside light was left on by accident one night it caused quite a stir in the hamlet, word coming back to us from not one, but two neighbours. We had a go at fitting new plugs, in France the socket is wired upside down compared to English, luckily a very patient plumber was on hand to make sure we got it right.
We've got power in our outhouse 'kitchen/bathroom' too.
The plumber had been at work in the bathroom and put in the shower tray. Our friend M had made two walls of the shower cubicle. This meant as well as tiling the bathroom floor we also had to build the other wall of the cubicle before we could tile it.
Our work was cut out. Before we started tiling the bathroom floor we ran amok with the drill and many screws, to try and keep as little movement in the floor as possible. This floor moves when you step into the room and we were worried that when it is tiled, they will move too. We bought flexible adhesive, hoping this would be ok.
Now, I've never laid floor tiles before so was very much tiler's apprentice to The Boss. She's tiled her conservatory before, and well, how hard can it be? We spend a long time laying out the tiles, working out the best line to follow deciding where the best place to have small cuts.
After we had worked it out, we donned our googles
and had a go at cutting, using a flat bed electric cutter. This wasn't as scary as I first thought, although when we cut along the length, it was a two woman job. We got 2 thirds of the floor glued down when we ran out of ready mix adhesive. When we went to find the other pot that we bought with us, we discovered that it was for use on concrete floors. Oh no! the wrong one.
We hopped in the car and went to the local Bricomarche, taking with us the cardboard from the tile box. Our box said the tiles were porcelain and the adhesives in Brico said 'not for porcelain'. We phoned the boys back home and asked them to google what we needed. It was 4.30pm, the store shut at 5.00pm and the next day was a bank holiday, not much hope of anything being open. As the boys were checking with whoever they could, we showed our package to a very helpful employee, he read the bit in French and said "pas de porcelaine," "they're not porcelain." "Yes they are," we said "it says so in English." "Non," he answered. He gave us a bag of adhesive and told us to go tile. We had a phone call from Smiley. He had phoned Bill from the pub who confirmed that if we could cut through the tiles easily they wouldn't be porcelain. We bought a mixer attachment for the drill, mixed up a batch of adhesive, and got the rest of the tiles down.
Now, I'm making this sound like it was simple. In truth tiling the floor was exhausting, we were up and down the stairs cutting the tiles and we were beginning to get tired. At one point The Boss asked me, "Can I cry now?" "No," was the very short answer "Get on with it, you can cry later."
Next job, next day, build the shower wall. We had run out of montants (uprights) to build the frame for the plasterboard. A trip to our local Gedimat, more of a builder's yard than DIY shop. We quickly measured the car and decided that 3 metre piece of metal would fit in, no problem. We bought two packs of ten, only to discover that packs of 10 don't fit in so easily as just 1. We tried lots of different ways of fitting them in, much to the amusement (or annoyance) of the men in the yard. Eventually we went for resting on the top of the seats with the back window open. We went back in the buy a ball of string to tie the window down, and were served by another very amused looking man.
After much prevaricating we decided to use the 'string' of the stairs to attach the montants to. Now I'm sure this isn't usual convention but it was what we did. As I helped Smiley make the kitchen wall last summer, I took the lead on this one.
The beauty of this system is that it is quick to do. Its all metal framework, not wood and you screw the plasterboard straight through into the rails.
We cut the plasterboard downstairs in the kitchen and manoeuvred it up the stairs in one piece. It's heavy but with no boys around to help we had no choice. Screwing the plasterboard through into the montants above head height was strength sapping.
The Boss got into the gap under the stairs next to the boiler to push against the board to make it easier for me to fix. It was very tight as you can see but she's still smiling.
We filled the gap between the plasterboard with insulation to stop condensation from the boiler and then screwed on the other piece of board. This was even more difficult to do than the first because of the restricted access under the stairs and I may have had a hissy fit up the ladder and thrown a screw somewhere.
Time to stop for the day, eat food and have a nice piece of Mille Feuille to calm down. That evening we tried to play a game of Scrabble but it was very low scoring.
Having finished the cubicle the next day's job was to tile it. We had ~ after quite a lot of discussion and emails ~ chosen a mosaic strip to go with the (cheap) large white tiles. On one angle the mosaics are browns and silver
but when the light hits them ~ disco tiles! Tiling the shower cubicle also proved to be strength sapping. Using rails for the straight edge was a mistake ~ they didn't remain straight! Unfortunately a wooden batten proved to be elusive. Cutting the tile edges, which were of course, all sort of stupid angles and sizes nearly caused meltdown.
We took a deep breath, walked up the lane for a break
and looked down at the house from the lane. Ours is the tall bit on the end, the bathroom being the one the shutters. Behind the hedge you can just see the overgrown garden.
Feeling revitalised, we got back to it.
For the shower taps I drilled holes through the tile, took the blade off the tile saw, and reattached it through the tile, and cut in a roughly circular shape. Again, I'm sure this defies normal convention but we're making this up as we go along.
We finished tiling the shower cubicle but by now it's Friday evening and we're booked on a 3 o'clock train on Saturday. We phoned Sarge and asked him to move our train back. We still have to grout the floor and the shower. We ate quickly, I put on my pyjamas and got stuck in for the long haul. We finished grouting the bathroom floor at 3.00 am. We were helped along by a nice glass of Crement, mine with blackberry liqueur, which made the whole process more enjoyable.
Trouble was, the shower still hadn't been grouted. Sarge phoned to say he had put us on the 8 o'clock train. We worked as quickly as we could but it was late lunchtime by the time we finished.
Ta-Dah!
We hit the road, eventually making the 10 o'clock train. We did of course, have our customary flan in the tunnel. Yum.
The next trip down is Smiley, Sarge and since he has now finished his GCSEs, Chopper. 3 boys, I wonder how that will turn out?
quite a project and a lovely area...your hard work is already reaping rewards...a great idea with use of the different tiles in the shower...a dramatic focal point...looking forward to following the progress...thank you for sharing...sally
ReplyDeleteIt is coming along rather well isn't it?
ReplyDeleteMa vie est belle grâce à vous, Mein Helfer. Seigneur Jésus dans ma vie comme une lumière de bougie dans l'obscurité. Tu m'as montré le sens de la foi avec tes paroles. Je sais que même lorsque je pleurais toute la journée en pensant à la façon de me rétablir, tu ne dormais pas, tu m'étais cher. J'ai contacté le centre d'herboristerie Dr Itua, qui vivait en Afrique de l'Ouest. Un de mes amis, ici à Hambourg, est également originaire d'Afrique. Elle m'a parlé des herbes africaines, mais j'étais nerveux. J'ai très peur quand il s'agit de l'Afrique parce que j'ai entendu beaucoup de choses terribles à leur sujet à cause de mon christianisme. Dieu pour la direction, faites un pas audacieux et prenez contact avec lui dans le courriel et puis allez à WhatsApp, il m'a demandé si je peux venir pour un traitement ou si je veux une livraison, je lui ai dit que je voulais le connaître j'achète des billets d'avion de 2 façons pour l'Afrique Pour rencontrer le Dr Itua, je suis allé là-bas et j'étais sans voix de la part des gens que j'y ai vu. Brevet, des gens malades. Itua est un dieu envoyé dans le monde, j'ai parlé à mon pasteur de ce que je fais, le pasteur Bill Scheer. Nous avons une belle bataille avec l'esprit et la chair. Adoration la même nuit. Il a prié pour moi et m'a demandé de diriger. J'ai passé 2 semaines et 2 jours en Afrique au Dr Itua Herbal Home. Après le traitement, il m'a demandé de rencontrer son infirmière pour faire le test du VIH quand je l'aurais fait. Il était négatif. J'ai demandé à mon ami de m'emmener dans un autre hôpital voisin quand je suis arrivé, il était négatif. Le résultat m'a fait perdre la tête, mais j'étais heureuse au fond de moi. Nous sommes allés avec le Dr Itua, je le remercie mais je lui explique que je n'ai pas assez pour lui montrer ma reconnaissance, qu'il comprend ma situation, mais je lui promets qu'il témoignera de son bon travail. Dieu merci pour ma chère amie Emma, je sais que je pourrais lire ceci maintenant, je veux vous remercier. Et un grand merci au Dr. Itua Herbal Center. Il m'a donné son calendrier que j'ai accroché au mur de ma maison. Le Dr Itua peut également soigner les maladies suivantes : VIH, herpès, hépatite B, foie inflammatoire, diabète, cancer de la vessie, cancer du cerveau, cancer de l'œsophage, cancer de la vésicule biliaire, maladie trophoblastique gestationnelle, cancer de la tête et du cou, lymphome de Hodgkin
ReplyDeleteCancer de l'intestin,Cancer du rein,Leucémie,Cancer du foie,Cancer du poumon,Mélanome,Mésothéliome,Myélome multiple,Tumeurs neuroendocriniennes
Lymphome non hodgkinien,Cancer de la bouche,Cancer de l'ovaire,Cancer du sinus,Cancer de la peau,Sarcome des tissus mous,Cancer de la colonne vertébrale,Cancer de l'estomac
Cancer du testicule,Cancer de la gorge,Cancer de la thyroïde,Cancer de l'utérus,Cancer du vagin,Cancer de la vulveDésordre bipolaire,Cancer de la vessie,Cancer colorectal,HPV,Cancer du sein,Cancer de l'anus.Appendice cancer.Cancer du rein,Cancer de la prostate,Glaucome., Cataracte,Dégénérescence maculaire,Cancer de la surrénale.cancer du canal biliaire,Cancer des os.maladie cardiovasculaire,maladie pulmonaire.hypertrophie de la prostate,ostéoporoseAlzheimer,cancer du cerveau.démence.érection faible,période d'amour,leucémie,fibrome,stérilité,maladie de Parkinson,maladie inflammatoire de l'intestin ,fibromyalgie, récupérer votre ex. Vous pouvez le contacter par e-mail ou drituaherbalcenter@gmail.com, ..numéro de téléphone de WhatsApp + 2348149277967 ... C'est un bon médecin, parlez-lui gentiment. Je suis sûr qu'il vous écoutera aussi.